LNG Cold Box RORO

Requirements

TIME Marine was commissioned to design a complete stow and securing package for an LNG cold box Ro/Ro operation.

Solution

TIME Marine completed the following scope of work:

  • Ship stability analysis
  • Ship motions analysis
  • Ship longitudinal strength check
  • Cargo stow and securing arrangement
  • Vessel deck strength Structural FEA

01-lngcoldbox-01-thumb01-lngcoldbox-02-thumb01-lngcoldbox-03-thumb01-lngcoldbox-04-thumb

Project Details

FEATURED PROJECTS

100% reliable icon

100% Reliable

Our structural design process is optimized to meet your project design life requirements.

Fast turnaround icon

Fast Turnaround

Our integrated hardware / software solutions are streamlined to meet your project deadlines.

Knowledge base icon

A Vast Knowledge Base

Since 1991 we've successfully completed over 2,500 projects.

ACCOMPLISHMENTS

Discover channel logo

Featured on Discovery Channel's "Extreme Engineering" for our work on the Woodrow Wilson bridge.

Break bulk logo

Presentation speakers for "Planning Your Heavy-Lift Transport" at Breakbulk conferences 2011 & 2012."

Nvidia logo

Assisted Nvidia with case studies for further research and development of their Tesla GPUs.

SOFTWARE WE USE

Ansys Logo
GHS Logo
Auto Desk Logo
Rhino Logo
Folding@Home Logo

Find out why our clients love working with us

Get in touch